Wait! Why are our walls pink and who’s bathing in our tub?

We have gone through the pre-drywall inspection.  The next step is insulation.  What can I say about insulation?  Not much ’cause it’s pretty boring stuff.  It’s pink, and we’ll never see it after the walls go up so I guess I can live with it for now. 🙂  They have started to put it in and should be finished within the next day.  After insulation is up and they inspect it, we get drywall!  It will start looking like a house after that!  So exciting!

Some pics for your enjoyment.

The tub has a black protective liner and is full to the top with water.  Maybe they are watering the deer while we are away….